Sample Written Program for Crane & Hoist Safety. A copy of the plan must be kept at the work site (see Deviations from the approved plan must be reviewed by the original approver. The supervisor in charge of the lift, or the hoisting and rigging program manager if requested, approves the plan. It is the responsibility of the Sub-contractor and Crane Contractor to ensure that they and their employees are appropriate and properly qualified, competent, professional, appropriately equipped and trained to perform the crane lifting activities outlined in this plan.

Find below safe work lifting plan template for use in crane lifting process. Lifting Plan Template Sample for Crane Lift – HSE.#1 task is to rig for load stability and be level in rigging. Note the configuration the crane will be in during the lifts and secure a copy of the appropriate rating chart from the Lift and Rigging Plan Known load weight and load configuration for appropriate rigging. The crane section of a critical lift plan delves into details about: The crane components Not every crane is good at everything, and sometimes they must be pushed beyond their comfortable bounds, in which case we must plan for that. The crane is an important part of any lift, and is often the initiator of the critical lift.Critical lift plan for cranes example: Here’s what you.

Critical crane lifts, if authorized, may have to be reviewed by a professional engineer (the contractor shall budget for the PE review) – see page 2, section 2 of the Crane Lift Plan for a list of critical lifts. A Crane Lift Plan is required for every crane lift on a Dimeo project – see OSHA Subpart CC for definition of crane.